Executed Projects

OUR EXPERIENCES

Leo Deep-Ocean Service Limited Engineers and Designers are carefully selected and well qualified with extensive experience in the oil and gas industry. Our engineers are fully conversant with both Nigerian and international Oil Gas Company standards and have successfully completed designs for NNPC, SPDC, Exxon Mobil, Chevron Texaco, Agip and Addax.

S/No.NAME OF PROJECT / CONTRACT DESCRIPTIONClientScopeDURATION & YEARS OF EXECUTIONCLIENTS CONTACT, PHONE & EMAIL
1 Cutting and replacement of 26” pipe flare Header to Western Battery Limit Kaduna Refining and Pet. Company Replacement 2 months Taimako E Jibria M.S.
2 Emergency patch repair on failed Clamp on 14 inches gas pipeline at Obigbo North (EOD) River State NGC Patch Weld 2 Days Mohamed J.J Godswill C.A.
3 Installation of 3 Nos 8” piles and Deck extension associated with the 12 inches Jumper line Modification works at Escravos Golden Triangle CNL Modification work 2 Months Chevron Suprint.
4 The sectional replacement of leaking section on the existing 24” X 28km segment of the Escravos-Lagos gas pipeline (ELPS) located at Battan swamp in Delta state NGC PIPELINE REPAIR 7 Days Chevron Suprint
5 CALL-OUT – INSTALLATION /REPAIRS OF FLOWLINES /PILINES IN CNL SWAMP LOCATION CNL PIPELINE AND FLOWSTATION REPAIRS 2 Years DAMOLA ADGBITE CONTRACTS MANAGER 19 REHABILITATION OF ESCRAVOS - WARRI PIPELINE PPMC PIPELINE REPAIR AUG 2009 – JAN 2010 R. C. STANLEY Managing Director
6 CONSTURCTION OF DUAL 10” X 65KM PIPELINE FOM OLADIMA TO OGHARA POOC PIPELINE CONSTRUCTION 3 Months FRED OROMA
7 CONSTRUCTION OF OKPORHURHRU 6” BULKLINE, 4” FLOWLINE, AND MANIFOLD. INCLUDING INSTALLATION OF BINDS SEPLAT PIPELINE CONSTRUCTION 3 Months NATHEL NBINI
8 REPAIR OF OLERO 18” BUCKLINE (RIVER CROSSING) CNL Repair 1 Week BEN OMITIMI 080-3342-7958
9 CONSTRUCTION, INSTALLATION & TESTING OF 30” PIPELINE SEGMENT FROM KP14 + 162 TO 29 + 375 NGC/ZAKHEM WELD AND LAY 3 Months AHMED SALEEM 08015356212
10 REPAIR OF OLERO 18” BUCKLINE (RIVER CROSSING) CNL Repair 1 Week BEN OMITIMI 080-3342-7958
11 CONSTRUCTION OF AROH 1 & 2 FLOWLINES AND OZIENGBE FLOWSTATION MANIFOLD MODIFICATION NPDC WELD AND LAY 4 Months OSAHON IGUS Osohon.10@npdc-nigeria.com
12 EMERGENCY PIPELINE REPAIR COVER (CALL-OUT) CONTRACT FOR WARRI – BENIN SEGMENT OF SYSTEM 2A PIPELINE PPMC Repair Monthly R. C. STANLEY MANAGING DIRECTOR
13 CONSTRUCTION DUAL 6” SCHEDULE 80 X 1.5KM FLOWLINE AT ONA 4/5 POOC CONSTRUCTION OF FLOWSTATION 1 Month FRED ROMAN 080-3405-6935 roman@CNLng.com
14 REPAIR OF DIBI – ABITEYE 10” WATER PIPELINE AND REPAIR OF OLERO – ABITEYE 12” PIPELINE CNL REPAIR OF PIPELINE 2 Weeks BEN OMITIMI 080-3342-7958
15 REPAIR OF DIBI – ABITEYE 18” PIPELINE CNL REPAIR OF PIPELINE 2 Weeks BEN OMITIMI 080-3342-7958
16 THE PATCH-WELD REPAIR OF 3NOS LEAK POINTS: OPUEDEBUBORS (2) AND IJALA (1) ON THE 20” NGC GAS PIPELINE ON ELP-A NEAR ESCRAVOS NGC REPAIR OF PIPELINE 2 Weeks Louis Hudson
17 REPAIR OF DIBI – ABITEYE 10” WATER PIPELINE AND REPAIR OF OLERO – ABITEYE 12” PIPELINE CNL REPAIR OF PIPELINE 2 Weeks BEN OMITIMI 080-3342-7958
18 REPAIR OF DIBI – ABITEYE 18” PIPELINE CNL REPAIR OF PIPELINE 2 Weeks R. C. STANLEY Managing Director
5 CALL-OUT – INSTALLATION /REPAIRS OF FLOWLINES /PILINES IN CNL SWAMP LOCATION CNL PIPELINE AND FLOWSTATION REPAIRS 2 Years DAMOLA ADGBITE CONTRACTS MANAGER 19 REHABILITATION OF ESCRAVOS - WARRI PIPELINE PPMC PIPELINE REPAIR AUG 2009 – JAN 2010 R. C. STANLEY Managing Director
20 FABRICATION OF 150 FLOATERS AND ROLLERS ZAKHEM NIG. LTD FABRICATION 13TH JANUARY 2009 – MAY 2009 JOHN PETTIGREW john.pettigrew@zakhem.com.gh
21 12” X 3.5KM NEMBE PIPELINE REPLACEMENT PROJECT SHELL PETROLEUM COMPANY NIG. LTD. AND NEST OIL LTD. CONSTRUCTION OF PIPELINE DEC 2008 – JAN 2010 GRAHAM CUSHION 07028378639 j.cushion@nestoilgroup.com
22 MAKARABA – UTONANA 16” PIPELINE REPAIR CHEVRON NIG. LTD. PIPELINE REPAIR 2008 BEN OMITIMI

080-3342-7958

23 MAKARABA 16” BULK REPAIR CHEVRON NIG. LTD. AND KONWAWIL NIG LTD PIPELINE REPAIR 2008 BEN OMITIMI

080-3342-7958

24 FABRICATION OF STEEL FORM WORKS FOR EGP3A CHEVRON NIG. LIMITED and HYUNDAI HEAVY INDUSTRIES FABRICATION 2007 MR SORAB

0807-2972-096

25 FABRICATION OF STEEL COFFERDAM PANELS FOR EGP3A (CHEVRON NIG. LIMITED) and HYUNDAI HEAVY INDUSTRIES FABRICATION 2007 MR SORAB

0807-2972-096

26 CONSTRUCTION OF 5,781.52M FROM KWALE TO BENEKU(P1-6 TO P1-15) PLATFORM PETROLEUM LIMITED FLOWSTATION FABRICATION 2007 PATRICK ERONWON 080-5619-5351 patrickeronmwon@yahoo.com
27 INSTALLATION OF 10,000BPD F/S FPROCESS PIPING AND ASSOCIATED WORKS PLATFORM PETROLEUM LIMITED FLOWSTATION FABRICATION 2007 PATRICK ERONWON

080-5619-5351

patrickeronmwon@yahoo.com

28 INSTALLATION OF 4”, 4Km,SINGLE FLOWLINE PAN OCEAN OIL CORPORATION CONSTRUCTION OF FLOWSTATION 2006 CONSTRUCTION OF FLOWSTATION
29 INSTALLATION OF 4”, 4Km,DUAL FLOWLINE PAN OCEAN OIL CORPORATION CONSTRUCTION OF FLOWSTATION 2006 FRED ROMAN 080-3405-6935 roman@CNLng.com
30 WATERLINE AND TIE IN AT CNL F/S PAN OCEAN OIL CORPORATION CONSTRUCTION OF FLOWSTATION 2006 FRED ROMAN 080-3405-6935 roman@CNLng.com
31 NDT, WELLHEAD & MANIFOLD FABRICATION AND HOOK UP PAN OCEAN OIL CORPORATION CONSTRUCTION OF FLOWSTATION 2006 FRED ROMAN

080-3405-6935 roman@CNLng.com

32 INSTALLATION OF VARIOUS LIQUID AND GAS TIE – IN POINTS AT OVADE – OGHARAFE F/S PAN OCEAN OIL CORPORATION INSTALLATION OF GAS LINE 2006 FRED ROMAN

080-3405-6935 roman@CNLng.com

33 16”MAKARABA – UTONANA PIPELINE REPAIRS CHEVRON NIG. LIMITED REPAIR OF PIPELINE 2006 FRED ROMAN 080-3405-6935 roman@CNLng.com
34 WELDING, STRINGING AND HYDRO TEST OF 20” WEST AFRICA GAS PIPE LINE NACAP PLS CONTRUCTION OF GAS LINE 2006 Gerald Stellema

080-2309-5565

35 SUPPLY OF 1000 TON BARGE “KARO” CHEVRON NIG LTD SUPPLY OF BARGE 2006 Engr Ben Omitimi

080-3342-7958

36 26” ABITEYE – ESCRAVOS PIPE LINE REPAIRS CHEVRON NIG LTD REPAIR OF PIPELINE 2005 Engr Ben Omitimi

080-3342-7958

37 ASSESSMENT/ HYDROSTATIC PRESSURE TESTING OF PIPELINES/FLOW LINES CHEVRON NIG LTD HYDROSTATIC PRESSURE TESTING OF PIPELINES/ FLOW LINES 2005
38 CIVIL CONSTRUCTION AND DEMOLITION WORKS CHEVRON NIG LTD UPROOTING AND CONSTRUCTION OF CIVIL SLAGE 2004 Engr Callistus

080-2336-3619

39 20” x 3.5KM PIPELINE CONSTRUCTION CONTRUCTION OF SHELL PETROLEUM DEV. COMPANYPIPELINE CONTRUCTION OF PIPELINE 2005 Engr. Chris